Gas Boosters

Gas Boosters

  • Model 588T
  • Model 588T

Model 588T

Boost the pressure of natural gas and biogas in any building, including offices, schools, factories, hotels, restaurants and more. 


Volume

Volume

2000 m3/hr

Pressure

Pressure

112 mbar

Power

Power

15 kW

Power Supply

Power Supply

400 V

Supply Phase

Supply Phase

3

Downloads

Everything you need

Features & Benefits

Working alongside British Gas, Secomak designed, developed & manufactured the first gas booster back in 1966. Our range is designed to increase gas pressure supply where required to allow the efficient and effective operation of Burners, Boilers, CHP’s, ovens, furnaces to name a few.

01

Machined from a solid

Secomak impellors are aerodynamically designed for maximum performance and efficiency. Constructed and machined from a single piece of aluminium ensures smooth rotation with unrivalled reliability.

02

Sealed for life Bearings

Sealed for life bearing design together with precision machined impellors result in a long operating life, fewer parts to maintain and incredibly quick and easy maintenance.

03

A range of boosters

Our boosters are available in many variations to match your pressure and flow demands. Available in single and 3 phase power and supporting 240 to 415V supply, we have solutions suitable for global installation requirements.

04

Built to last and gas safe

Designed and manufactured in the UK, each gas booster assembled goes through rigorous testing in accordance with the British Standard 8487:2007. Delivering maximum product quality, consistency and conforming to IGEM UP/2 Regulations.


Available Packages

Enquire About

Model 588T

Contact us
Model 588T

Related case studies

  • Tottenham Hotspur Stadium

    Tottenham Hotspur Stadium

    Tottenham Hotspur’s 2019 Stadium needed high pressure gas to supply the boxes, brewery, offices and bar/restaurant. Enter Secomak’s Gas Sensor…

    Read More
  • Facebook – Brock Street

    Facebook – Brock Street

    A comprehensive gas supply upgrade to Facebook’s London Head Office required more powerful, higher capacity Gas Boosters to serve the…

    Read More
  • New 581/2 Gas Boosters installed in The Minster Building, London

    New 581/2 Gas Boosters installed in The Minster Building, London

    Replacement gas boosters were required to serve existing and new boilers within an existing building in Central London

    Read More